1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / rizwan akbar
bricks 500
cement 1.54 bags
sand .32 m^3
for C:S 1:6 brick work
| Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
What is rate of concrete surface rendering work per sqm
How much quantity of rod binding work by a rod binder per day
What Reinforcements Are Used In The Process Of Prestressing?
may i know the detailed description of cutting length
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
what is right & short method of measurement of slab&beam
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
For what purpose bedding is used under storm water drains?
what is the difference between tsp & tower
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
Calculation of Pier Cap with tapper area?