beam length 73 feet 4 inch,width 01 feet,height 50 inch so
every beam load how much? and what quantity of M.S ROD?
both side ony two column in middle no column.pls inform me
that this is stable or not ? and how much risk of this beam?
No Answer is Posted For this Question
Be the First to Post Answer
16. What do you consider to be your greatest achievement so far and why?
What's is mean by survey
what is mean by tremie concrete
1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3"
48 Answers Alcove Infrastructure, Anantha Infra, L&T, Microqual, Shoba Devlopers, SSC, UltraTech, Valdan, VVA Developers,
In structural steel work what should be the wastage percentage considered to order the material( 200x200x5mm box section) in standard available sizes in India i.e. 6 mtrs?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
How to calculate carrying capacity of the existing water supply trunkmain
what is c&c++?
W mm mix rasio
What is soil enforcement?
what is the weight of one cubic meter M20 concrete ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)