1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / vivek rai
1M=39.37Inch.
1Cum =61023.37
no of bricks =61023.37/9*4.5*3 =502.25 or 503nos
for mortar 3.5 = 10 cum ,1 cum =0.35
0.35/(1+6)=0.05
for cement 0.05/0.0347 (for 50 kg cement bags ...1450kg/cum)
=1.440 or 1.5 no. of bags
for sand 0.05*6= 0.3 cum...
Ans.. 503 bricks, 1.5 no.bag of cement and 0.3 cum sand
| Is This Answer Correct ? | 10 Yes | 20 No |
Post New Answer View All Answers
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
what is your role of in previous company as a construction manager
What is the difference between Hinged and pinned in Column ends
what is the difference between replacement of cement by groundnut shell ash
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
how much shouid be the rate for ready mix concrete per cubic meter
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
dialation means
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
what are the changes in concrete pour height as per IS 456, 2009?