1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answers were Sorted based on User's Feedback
Answer / shahul hameed
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0
= 10-1+ 1 + 1 + 1 + 1 + 1+0
=9+5 =14
| Is This Answer Correct ? | 14 Yes | 0 No |
Answer / er shalu verma
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0
=(1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1) - 1 + (1 + 1 + 1 +
1 + 1) + (1 x 0)
=10-1+5+0
=15-1
=14
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / dharmendra ray
1+1+1+1+1+1+1+1+1+1-1+1+1+1+1+1+1x0
=1+1+1+1+1+1+1+1+1+1-1+1+1+1+1+1+0
=15-1+0
14
| Is This Answer Correct ? | 3 Yes | 0 No |
Management diagram of your project is–––
What is the unit weight of cement,sand,Brick,Reinforcement concrete
How much quantity of rod binding work by a rod binder per day
mix design procedure, i.e m15 to m40
WHAT ARE TYPES OF STRUCTURES
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
why you have choosen civil engineering as a carrier ,what goals do u have and how you wil aschiene it?
Construction joint of beam & slab is provided at––
Please tell me about surveying standard chain details.Thanks.
state the functional requirement of a retaining wall
How to calculate the wall thickness of building?
for columns reinforcement the lap length is not provided then how to rebar the rods then how rebar should be lapped
4 Answers Nagarjuna Construction,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)