Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the formula to calculate the volume of mortar
required for a wall with 1245 blocks with a stndard size of
440x215x100?

Answers were Sorted based on User's Feedback



What is the formula to calculate the volume of mortar required for a wall with 1245 blocks with a ..

Answer / aabid

3.32 m3 use mortar volume

Is This Answer Correct ?    0 Yes 0 No

What is the formula to calculate the volume of mortar required for a wall with 1245 blocks with a ..

Answer / sjtbehera

Please obtain length of wall. Then you calculate cum. Then mention ratio of mortar. Add 15% more to mortar fpr wastage and gap filling. Divide to cum obtain obtain cement.

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

What is difference between ceramic and vitrified tile

1 Answers   Student,


Rectangular room is more effective than a square room because ––

1 Answers  


why only water cement ratio always......why not water sand ratio while making concrete

2 Answers  


What are new technologies in civil engr. that can reduce construction cost?

2 Answers   HCC,


how to calculate amount of materials for concreting and plastering?

3 Answers  


How much Pressure will apply in Water proofing Grouting method to fill the crack in beams or slabs?

2 Answers   GMC,


How much cum. Brick work can do by 1 madon

0 Answers   DLF,


What is the difference between simply supported beams and cantilever beams

2 Answers   Osmani Constructions,


The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the questions....ramyakvb@gmail.com....if u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl

1 Answers  


what is meant by camber

1 Answers   NCC,


What is the exception critarea of cube?

0 Answers   Nalco,


what are some possible sources of error in the CBR test?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)