Answer / princekapoor
Design mix and Nominal mix
Design mix is that which is achieved by mixing different
quantities of aggregates and binder (Cement) by trial and
error to get the desired compressive strength for say M15.
M15 concrete may not be necessarily 1:2:4 for different
varieties of aggregates.
Nominal mix is the standardized mix achieved by designing
which can be used without further designing in the
prescribed ratios like 1:2:4 or 1:1.5:3. These are never
denoted as M15 or M20
| Is This Answer Correct ? | 36 Yes | 2 No |
Answer / shila
Design mix is that which is achieved by mixing different
quantities of aggregates and binder (Cement) by trial and
error to get the desired compressive strength for say M15.
M15 concrete may not be necessarily 1:2:4 for different
varieties of aggregates.
Nominal mix is the standardized mix achieved by designing
which can be used without further designing in the
prescribed ratios like 1:2:4 or 1:1.5:3. These are never
denoted as M15 or M20
| Is This Answer Correct ? | 3 Yes | 3 No |
Answer / vijayaraj24
Types of mixing are wet mixing,dry mixing & hand mixing & machine mixing
| Is This Answer Correct ? | 4 Yes | 9 No |
What is difference between limit state and working stress method? How it is applies in building structure.
How many bricks are there in 100cft?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
0 Answers Ras Engineering, UltraTech,
what opc & ppc cement $ composition?
How do you calculate the unit weight of concrete?
what is meant by belt in house construction?
methode of psc girder stressing
I got a concrete base to do 2200 x 2200 x 150 mm can you tell me how to calculate the quantity of cement to use
i wanted to know the quantity of cement and water cement ratio for 150mm*150mm*150mm mould.Grade of concret m20
how many time use of plywood shuttering and IS code
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
Why do you want to work here
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)