1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??

Answer Posted / akhlaque

answer will be 14

Is This Answer Correct ?    8 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the uses of layer?

725


Where will be the maximum bending moment in a TEE Beam?

6530


What is progress payment?

696


for pretensioning which will yield first and same for post tensioning?

1699


What is the cemnent ratio

1814






Types of column foundation and how to calculate its steel quantity.

1431


What is difference between engineering stress and true stress?

660


what is the water cement ratio for plastering

1153


 rcc floor to floor  4m. in column reinforcement where we provide lap in exact location.     

1483


What are the strongest shapes in building?

644


how i convert mm into standard wire guage (SWG)no.

2588


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

1553


what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????

1620


What are moment of inertia and its importance in civil engineering?

688


primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

1627