1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / venkatesh
14
Is This Answer Correct ? | 11 Yes | 3 No |
Post New Answer View All Answers
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
how clculate excavated or backfilling quantity by simpson's rule
Explain creep?
what else we can add rather than admixture in concrete to reduce the cement quantity?
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
Howmuch bend to be provide for 200/600 BEEM
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
What is difference between limit state and working stress method? How it is applies in building structure.
Time required for curing of wall tiles before fixing
what is civil all interview questions
How to calculate carrying capacity of the existing water supply trunkmain
What are the different methods for drawing an arc?
will fix foundation bolts at site with out template is there any procedure?
what is Short bored pile foundation.