1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??

Answer Posted / shahul hameed

1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0

= 10-1+ 1 + 1 + 1 + 1 + 1+0
=9+5 =14

Is This Answer Correct ?    14 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour

1074


Why should appointment store person for project ? what is the benefits for company ?

599


What is the effect of a building collapse?

603


Formula for calculation volume of essentric footing

1241


How is the leaning tower of pisa supported?

612






How to calculate volume of concrete & steel on tank foundation & ring wall ?

1104


What is pre-stressed concrete?

639


what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain

1284


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

2728


Define What materials were used to build the Golden Gate Bridge?

622


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

1675


what is pouring and explain

1803


Design a rectangular channel.

2435


Explain the latest method to detect a crack in a building?

647


I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.

1847