how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
Why should appointment store person for project ? what is the benefits for company ?
What is the effect of a building collapse?
Formula for calculation volume of essentric footing
How is the leaning tower of pisa supported?
How to calculate volume of concrete & steel on tank foundation & ring wall ?
What is pre-stressed concrete?
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
Define What materials were used to build the Golden Gate Bridge?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
what is pouring and explain
Design a rectangular channel.
Explain the latest method to detect a crack in a building?
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.