How much steel required in 1 square feet slab?
Answers were Sorted based on User's Feedback
Answer / pramansrivastava
.75 kg to 1.1 kg steel required for 1sqft slab.
| Is This Answer Correct ? | 138 Yes | 22 No |
Answer / sudhir patil
its totally depend on the design of that perticular
structure.Normally its seen that G + 7 structure is having
2.8 to 4 kg per Sft & High rise building having 9 to 12 kg
per sft.
| Is This Answer Correct ? | 48 Yes | 15 No |
Answer / babar
It is only depend that which dia of bar in slab is being used
| Is This Answer Correct ? | 19 Yes | 3 No |
Answer / karthick
it is depended upon the structural design but normally for a nominal slab with single floor it is 1.3 to 1.5 kg of steel is used
| Is This Answer Correct ? | 20 Yes | 7 No |
In multistory building
----------------------
1- Raft + Retaining wall (In case basement)--- 8kg/sqft
2- basement roof slab i/c non tower slab,
( Column from basement floor to stilt floor + basement roof
slab slab)-- 6.5kg/sft
3 - typical floor / for each floor ___ 4.5kg/sft
| Is This Answer Correct ? | 17 Yes | 7 No |
Answer / waseem khattak
you can only assume or can calculate from structure drawing
normaly 30 ton steel required for 1 kanal plot with basement
and rcc wall
| Is This Answer Correct ? | 3 Yes | 5 No |
Answer / faizan
i think the 1 sq fit area is consume of 1.5 to 2 kg/sq fit
| Is This Answer Correct ? | 5 Yes | 7 No |
detailed calculation of the amount of cement used?
how to calculate the wind pressure
what is the specific gravity of rubble in plum concert
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
what is pile foundation?
in railway engineering, what are the types of guages? what is its size,length & thickness?
what is the difference between rise and tread? what is its standered size? what is waist slab?what is the standered length of staire-case? also what is the angle between floor and landing?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
How To Measure Honey Comb Full Brick Work, Can we deduct Hole, If Yes, how to Calculate Rate Analysis
how many bricks are required for masonary trench having length of 31 mtr, depth of 0.6 mtr and breadth of 0.45 mtr on single brick work as well as double ( 9" ) brick work
per 1 cumt concrete how much manhours is required including shuttring,steel etc.,for slab & foundations
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)