1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / kiran
14
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
What is meant by solid geometry?
on what basis the partial factor of safety are decided? form the load combinations
Pls explain me about tension and compression in a flat slab
For the construction project what capital cost has to be taken in consideration?
I need old MMUP exam question and answer for Civil engineering
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
How many bricks are there in 100cft?
What is the l/d ratio of cantilever beam?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
How to calculate the crank rod in slab
how to calculate the weight of concrete
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
What are the steps involved in the concreting process?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building