As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
what is a coupler and where do u use it ?
how to calculate cutting length of stirrups bar in beam
State the type of roads and compare the advantages and disadvantages?
What is the difference between 53 grade and 43 grade cement
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
0 Answers Era Infra Engineering, Tricom,
Are you interested in starting a fly ash brick making unit?
what is the proportion of m20 grde concrete? also how much water is required for this proportions? As there were any formula for water-quantity?
Current ctc and expected ctc? Should i tell or as per Compnany norms? I am not fresher (1 yr exp) so how should i Face it
what is mix design
What are the different methods for drawing an arc?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)