how material can be calculate for brick work in 1:6
Answers were Sorted based on User's Feedback
Answer / shraddha
assume volume of brick masonary=10m3
dry volume=35% more=3.5 cu.m.
1.volume of cement=(3.5/7)*1=0.5cu.m
2.volume of sand=0.5*6=3 cu.m
3.no.of bricks=(10/0.004)=2500 No's
Is This Answer Correct ? | 5 Yes | 9 No |
ONE PART OF CEMENT OR LIME & SIX PART OF FINE AGGREGATE.
Is This Answer Correct ? | 6 Yes | 21 No |
what type of cement are used for fixing of tiles at floor/wall
Defination of civil engineering
how many cement bags in 1m^3 cement concrete in all grade
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
List out the densities of different construction materials such as brick, steel, sand, aggregate etc...
which type of cement is used for RCC construction?Why?
What is the purpose of Chipping in the heavy foundation?
What is reinforced brick masonary and its advantages and applications, arrangement of steel
What kind of foundations used in block cotton soils
HOW TO PARKING SPACE HS CALCULATED IN MULTISTORY BUILDING?
What is meant by Crystal Concrete?