how material can be calculate for brick work in 1:6
Answers were Sorted based on User's Feedback
Answer / shraddha
assume volume of brick masonary=10m3
dry volume=35% more=3.5 cu.m.
1.volume of cement=(3.5/7)*1=0.5cu.m
2.volume of sand=0.5*6=3 cu.m
3.no.of bricks=(10/0.004)=2500 No's
| Is This Answer Correct ? | 5 Yes | 9 No |
ONE PART OF CEMENT OR LIME & SIX PART OF FINE AGGREGATE.
| Is This Answer Correct ? | 6 Yes | 21 No |
What is the full form of BHEL? A) Bharat hydroelectricity Limited B) Bharat Heavy Electronics Limited C) Bharat Heavy Electricals Limited D) Bharat Heavy Enterprises Limited
what is PEB structure
what is piers?
What is BDF flooring?
residential projects,structural.
0 Answers Ambuja, KBR, Saudi Aramco Shell Refinery Company SASREF,
When column of building is abutting the boundary line,then suitable footing advised is
Define What are the materials used in building a gravity dam?
Which standard describes the tolerance limit for undulation of RCC wall/ after POP surface?
For fine aggregate which is most suitable River sand or crusher sand & why ?
Any body tell me how can we calculate 1m3 quantity of cement sand aggregrate in kg.
13. What are your expectations from this possible relocation to our company?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)