How to do rate analysis for concrete work including shuttering work?
No Answer is Posted For this Question
Be the First to Post Answer
what is the unit weight of steel(kg/cum)& unit weight of concrete in(kg/cum)?
what is the development length formula as per concrete grade
why demand factor less then 1 ?
What is difference between MS and Tor steel ?? Please ellobrate...or state its charactersitcs??
4 Answers CLG, Indiabulls, TOR,
why top layer of block work shoud be full size if any cut block adjustable than another layer?
what is the density of the polythene sheet
What"s mean by water bound macadam road(WBM)?
how much extra rod length should be provided for beam
How to determine thee cut length for steel reinforcement bars in R.C.C design
8mm.2l@7" c/c in footing column drawing,mean of 2l,4l in the Column drawing please answer give with example,thankyou,
For M25 concrete ,what is the maximum compressive strength at 28 days ?
6 Answers L&T, Techno Builders,
hook and bend length in reinforcement?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)