1:4:8 pcc calculation 591 cu.ft
No Answer is Posted For this Question
Be the First to Post Answer
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
In IS:456-2000 the workability of concrete is given in mm (slump)in cl.7.1. In IS:10262-1982, cl.3.3.4 & table-6 says +/- 3 percent adjustment is required in the quantity of water (calculated as per table-4 or 5), for each increase or decrease in the value of compacting factor (i.e. workability of concrete) by 0.1. How it is possible to calculate the exact quantity of water required for a particular grade of concrete? What is the relation between Slump & Compacting factor of concrete?
1)What's are the diff. types of column based on loading? 2)Is there any difference bitween Development length & Anchorage Length? 3) What is the basic diff. between one way & two way slab? 4) Where should use OPC & where should PPC?
what is the thickness of plasters on the external and internal walls at site in india???
I want to construct 1850 square ft of rcc apartment , with stilth parking , the site requires 18 ft of pile foundation , the apartment will be above ground parking , can some one guide me about the cost of construction of such structure in Pune ?
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
how to calculate quantity of concrete volume of pile with bulb
As per IS 2502 2(A+B)+24d formula is given for stirrups detailing,but explination not given for how that 24d came
what will do when 7days concrete has failed and structure has constructed?
How many types bend used in civil reinforcing
How to calculate construction cost of residential building in mumbai
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)