how material can be calculate for brick work in 1:6
Answer Posted / ajay kumar sharma
1 tagari cement and 6tagari sand
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
What things architect have to take care of before starting any project?
What is the origin of name railway sleepers?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
What is a bearing capacity of soil?
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
How does siphoning work?
For the construction project what capital cost has to be taken in consideration?
why development length = 50D . why not 100D
what is the use in canals of longitudinal drains and cross drains in lining areas?
what are the proper pipes for salt water line
explain five benefits of using standard terminology in the measurement process?
What is Critical path in Ms-Project ?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
what is the painting co efficient of slope roof tiles?