how material can be calculate for brick work in 1:6
Answer Posted / shraddha
assume volume of brick masonary=10m3
dry volume=35% more=3.5 cu.m.
1.volume of cement=(3.5/7)*1=0.5cu.m
2.volume of sand=0.5*6=3 cu.m
3.no.of bricks=(10/0.004)=2500 No's
| Is This Answer Correct ? | 5 Yes | 9 No |
Post New Answer View All Answers
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
What is specific gravity???
3. What are the disadvantages of your present job, things you do not like about it?
What is the sugested procedure of water purification for public supply?
How do you calculate the power of centrifugal pump?
What is rate of concrete surface rendering work per sqm
What Are The Steps Involved In The Concreting Process, Explain?
What is the tallest man made structure in the world?
residential buildings,mixing of concrete,structural,construction material,site handling.
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
Explain the design for rcc multi-storied building?
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
why development length = 50D . why not 100D
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?