what should be the strength of Concrete cube strength for 7
days, if the designed mix is M20?
Answers were Sorted based on User's Feedback
Answer / viki
generally concrete attains 60-70% of its 28 days strength
in 7 days.After 28 days strength of M20 concrete will be
20N/mm2.so after 7days it would be 12-14 N/mm2.
Is This Answer Correct ? | 113 Yes | 28 No |
Answer / n.c.pathan
Concrete does attain strength of about 65% after a period
of 7 days. With good quality of cement nowadays available
we generally get better results. Many a times strength
exceeds 70% of 20N/SQ MM.
Is This Answer Correct ? | 27 Yes | 10 No |
Answer / g.mugesh
Grade of concrete:m20
7days test (67.5%) - 20*67.5/100=13.35 N/MM2
28days test(100%) - 20 N/MM2
Is This Answer Correct ? | 19 Yes | 10 No |
Answer / himanshu sekhar pradhan
Actuall all grade of concrete design upon its target
strength. Then for M20 we have to design the mix on
26.6N/mm2 and all grade of concrete should achive its 60 -
75% strength in 7days. Then the actual strength of M20
grade of concrete at 7days should be 17 -20 N/mm2.
Otherwise there is chance of fail.
Is This Answer Correct ? | 11 Yes | 4 No |
Design mix is M20 So Target strenth is Fck+4 = 24N/MM2
For 7 Days Cube strenth is 16.24 Exact (7days@67.67%)
For Individual Cube strenth become is Fck-3 = 13.24
But Average Sternth is required is 16.24 (must)
For any Civil engineering related questions
Contact by mail skatiyar011@yahoo.in
Is This Answer Correct ? | 10 Yes | 6 No |
Answer / sathish
Actually concrete attains 64-70% of its 28 days strength
in 7 days.After 28 days strength of M20 concrete will be
20N/mm2.so after 7days it would be 12.80 -14.00 N/mm2.
Is This Answer Correct ? | 8 Yes | 5 No |
Answer / nithin
Is there any reference to 7 day strength in is codes.
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / sandeep
If grade of concrete is M20
Then after 7 days it will be 2/3 of 20 n/sq mm
Means 0. 666*20 = 13. 20 n/sq mm
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / devendra jatav
7 days - 70 to 75% strength
28 days - 100% strength
Is This Answer Correct ? | 0 Yes | 5 No |
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
How to find beam R/F cutting length
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
0 Answers Public Service Commission,
WHY THE WIDITH OF COLUMN IS TAKEN FOR DESIGN OF ISOLATED FOOTING??
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
how to find the diameter of steel bar from steel area
what"s the formula find the cement consumption for brick work 23 thick wall 1 m3?
7 Answers L&T, Vipul Chemicals,
HOW TO PARKING SPACE HS CALCULATED IN MULTISTORY BUILDING?
Formula of mid span bar
0 Answers Modern Construction Company, PFPL,
What is the cost of Brickwall ( 4")(1:4) thick wall total Area 245 sqft with plaster(1:6). With all materials including.
Basic questions of civil engineering
0 Answers ONGC, RB Construction,
what is the bar bending schdule