what motivates you to do a good job
Answers were Sorted based on User's Feedback
Answer / anish kumar
The answer to this one is not money, even if it is. You should be motivated by life’s noble pursuits. You want recognition for a job well done. You want to become better at your job. You want to help others or be a leader in your field.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / Bhaskar Bisht
Motivation to do a good job can come from various sources such as personal satisfaction, sense of accomplishment, learning new skills, and making a positive impact. Additionally, the desire to meet or exceed expectations set by others, such as supervisors, colleagues, or clients, can also serve as a strong motivator.
| Is This Answer Correct ? | 0 Yes | 0 No |
how to calculate mivan shuttering matrial
how to clculate the %of concrete strenght achive after curing?load
1 Answers L&T, RJ Construction,
How to activate isometric axes in cad?
what is the mixing ratio of the cement mortar for tiles fixing in floor tiles?
5 Answers NLC, Prakash Engineers,
how to find out spacing inbetween bars instead of 8dia 100c/c to 10dia bars
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
What is steel reinforcement required for 1000 sqft house as per besic RCC frame structre ?
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
what is singly & doubly rc beam? what is difference between them?
how we can calculate the quantity of sand & cement & also Aggregate so give me to this answer for a slab Length is : 25' /3.28 = 7.62 Mtr Width is : 30' /3.28 = 9.14 Mtr Depth is : 0.6"/3.28 = 0.15 2Mtr
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)