how many shuttering material required for 1000 sq.m built up area.
No Answer is Posted For this Question
Be the First to Post Answer
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
what is the meaning of TMT Bar and what is benifit of these Bars?
state the main objectives of underpinning
How much percent of steel use in concrete members etc.slab,beam,lintal,colmn,raft fondation according to concrete volume? Kindly reply me I am in dbout plz
What is the withdrawal force of steel nails?
How many types of traps are used?
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
Should vertical shuttering done for CC/ RCC for Damp Proof Course (DPC) be measured?
what is the meaning of m35 grade concrete ?
2 Answers Aparna Constructions,
what is inspection?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)