Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.

Answers were Sorted based on User's Feedback



What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40...

Answer / ramesh kularia

This question asked by me so why I answer it...........!!!!

Is This Answer Correct ?    26 Yes 7 No

What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40...

Answer / sk abdul jabbar

ans-5

Is This Answer Correct ?    19 Yes 3 No

What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40...

Answer / randy kali

M10  =  1: 3 : 6

M15  =  1: 2 : 4

M20  =  1: 1.5 :3


M25  =  1 : 1: 1.5

M30  =  1" 1 : 1

Is This Answer Correct ?    17 Yes 3 No

What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40...

Answer / neeraj bhardwaj

M-10 1:4:8(with aggregate 40mm nominal size)
M-10 1:5:10(with aggregate 20mm nominal size)
M-15 1:2:4
M-20 1:1.5:3
M-15 1:1:2
M-30 & Higher grade design mix followed

Is This Answer Correct ?    14 Yes 1 No

What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40...

Answer / manish

M5 1:5:10
M7.5 1:4:8
M10 1:3:6
M15 1:2:4
M20 1:1.5:3
M25 1:1:2

Is This Answer Correct ?    12 Yes 0 No

What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40...

Answer / srividya.m

M5 1:5:10
M10 1:3:6
M15 1:2:4
M20 1:1.5:3
M25 1:1:2

Is This Answer Correct ?    13 Yes 2 No

What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40...

Answer / durga prasad akula

M5 -1:5:10
M7.5-1:4:8
M10 -1:3:6
M15 -1:2:4
M20 -1:1.5:3
M25 -1:1:2
M30 -1:1/2:1

Upto M20 we have to follow this ratio no problem, but after M20 we should better go to design mix means it's better for structure strength and durability.

Is This Answer Correct ?    10 Yes 0 No

What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40...

Answer / madhukar tiwari

In Indaia Mumbai the ratio is as follow
M5 - 1:5:10
M10 - 1:4:6
M15 - 1:2:5
M20 - 1:1.5:3
M25 - 1:1.25:2.5
AND THE RATIO IS ALSO DEPEND ON SAND.
THAT WHY IF SAND QUALITY IS VERY GOOD THEN RATIO MAY BE CHANGE....

Is This Answer Correct ?    17 Yes 8 No

What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40...

Answer / waghmode ashkita

M10 1:3:6
M15 1:2:4
M20 1:1.5:3
M25 1:1:2

Is This Answer Correct ?    8 Yes 0 No

What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40...

Answer / kaushik chowdhary

M10= 1:3:6
M15= 1:2:4
M20= 1:1.5:3
M25= 1:1:2
.
Mix Design from M30 onwards

Is This Answer Correct ?    9 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

Q Structural Behavior Of Statically Determinate And Indeterminate Reinforced Concrete Structure?

1 Answers   Student,


What is meant by Rolling Margin? & which material will effect in this ?

2 Answers   Construction, L&T,


What will be compressive strength of bricks , Hollow blocks, Solid blocks

14 Answers   Aimil, Daewoo, EIT, HCL, Logos, Pratibha Industries,


How is the leaning tower of pisa supported?

0 Answers  


What is the software used in civil engineering?

0 Answers  


how to calculate mivan shuttering matrial

0 Answers  


what is quick sand

4 Answers  


hi... how to find reaction in continous beam 4 different span ?

1 Answers  


wht is off shore structure

1 Answers  


how to calculate the quantity of steel in a slab , beam and coloumn

2 Answers   L&T,


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

0 Answers  


what is mean by bond strength?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)