What things architect have to take care of before starting any project?
No Answer is Posted For this Question
Be the First to Post Answer
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
What should be the required steel in column, beam and slab
i m a btech 1st year student of civil branch. i want to do mba in future after having some work experience in civil field.is there any mba course made exclusively for civil engineers?
M25calculate of formula which in kg cement of 1cum
Define What does civil status mean?
for construction of 1 cum of brickwork what is requirement of cement, sand and bricks
3 Answers Nirman Consultants, Shapoorji Pallonji Group(SPCL),
What is is code for use TOR
How you Confirm the Hard stratum for Driven cat in situ Pile work?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
what would be the rqmnt. of cement and sand (1:6)for building brick wall and also 20mm thick plaster on the wall by same ratio?
how the take measurement at column and beam junction
what will do when 7days concrete has failed and structure has constructed?