What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.
Answer Posted / neeraj bhardwaj
M-10 1:4:8(with aggregate 40mm nominal size)
M-10 1:5:10(with aggregate 20mm nominal size)
M-15 1:2:4
M-20 1:1.5:3
M-15 1:1:2
M-30 & Higher grade design mix followed
| Is This Answer Correct ? | 14 Yes | 1 No |
Post New Answer View All Answers
is concealed wiring a problem in fly ash brick wall?
How many kilo-newtons equals 1000 kilogram?
How to calculate brick work quantity?? Block work quantity??
How many square meter can mason layout chb per hour
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
how to find out hard strata in bored pile when the DMC method adopted.
Which IS Code/American Code applied for coupler test of steel
Formula of area of crane hook
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
What ingredients with% found in ppc cement??