What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.
Answer Posted / durga prasad akula
M5 -1:5:10
M7.5-1:4:8
M10 -1:3:6
M15 -1:2:4
M20 -1:1.5:3
M25 -1:1:2
M30 -1:1/2:1
Upto M20 we have to follow this ratio no problem, but after M20 we should better go to design mix means it's better for structure strength and durability.
Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
What are the joints wants to made in masonry where door opening, arches like etc..
How is calculate the cube molt
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
What is meant by solid geometry?
how i can tak Quantity of mortar in block work
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
How to decide/consider the grade of bitumen for dbm.
"Gates of the dams are generally designed of curved shape". Why?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
for pretensioning which will yield first and same for post tensioning?
cause of cylinder test failure
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.