Bitumen grades are 30-40,60-70, 80-100. what is mean by 30-
40
Answers were Sorted based on User's Feedback
the penetration caused by standard Condition i.e.
Standard Weight= 100 gm
Standard temp. = 25 Degree C.
Standard penetration time = 5 Seconds
Unis = 10th of mm to show the results and avoiding Errors
e.g. if the value is 30/40, the 30/40 is the bitumen
penetration value (tested in standard condition) lies
between 3 to 4 mm.
Is This Answer Correct ? | 109 Yes | 7 No |
Answer / nilesh ghadge
IT MEANS IT HAVING THE PENETRATION VALUE BETWEEN 30 TO 40
Is This Answer Correct ? | 141 Yes | 47 No |
Answer / tawalbeh
yes, and the unit is (0.1mm) ..
e.g: 80 = 8mm = 0.8cm
Is This Answer Correct ? | 98 Yes | 13 No |
Answer / venky
the needle denotes in 1/10th 's ofmm....so it mean 3mm to 4 mm
Is This Answer Correct ? | 50 Yes | 7 No |
Answer / anwar_eng04
the rage 30-40 means the bitumen has having grades between
these two valus and and it is determined by average
peneteration value of the test which conducted by the
instrument called penetrometer.
Is This Answer Correct ? | 37 Yes | 5 No |
Answer / hossain
Penetration value (tested in standard condition) lies
between 3 to 4 mm.
Is This Answer Correct ? | 11 Yes | 4 No |
Answer / abir kumar ghosh
30-40 means bitumen having penetration of a needle between
30-40 mm with standar weight on it at 25 deg Centigrade.
Lower the penetration is higher the viscosity.
The test is done with the apratus called Vicats apparatus.
Is This Answer Correct ? | 28 Yes | 25 No |
Answer / abir kumar ghosh
30-40 means bitumen having penetration of needle (with
standard weight)between 30-40 mm in 5 seconds at 25 deg
cent.
The test done with a apratus called Vicats apparatus.
Is This Answer Correct ? | 26 Yes | 23 No |
Answer / aditya richie
30-40 means bitumen having penetration between 30-40 mm .
The test done is called bituminous penetration test ,
machine used is vicats apparatus.
Is This Answer Correct ? | 26 Yes | 29 No |
very simple or less time consuming formula for reinforcement calculation by moment
Floor tile measurement? Wall to wall or skirting to skirting
What is the ratio of M40 Concrete?
How to test the quality of Ready Mix M20 concrete (1:1.5:3) before casting at site when lorry arrives? Are there any methods?
9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement
Middle point of any slab is raised 10-12 mm during shuttering work because––
16. What do you consider to be your greatest achievement so far and why?
How many kilo-newtons equals 1000 kilogram?
what is difference between active and passive earth pressure. how it effect the retaining wall design ?
why you have choosen civil engineering as a carrier ,what goals do u have and how you wil aschiene it?
How to calculate the no of bags required for 12mm thick 1:6 plastering?
What is civgl engg?