Bitumen grades are 30-40,60-70, 80-100. what is mean by 30-
40
Answer Posted / tawalbeh
yes, and the unit is (0.1mm) ..
e.g: 80 = 8mm = 0.8cm
| Is This Answer Correct ? | 98 Yes | 13 No |
Post New Answer View All Answers
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
how to calculate freeboard in under ground water tank and technical details
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
how do you stabilize a waterlogged area in road construction
What are the techniques to measure road difference?
afe or not
what is floating slab foundation?
For a washout valve why are two gate valves required in normal practice?
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
What is the release of lien?
How and where are aqueducts built?