Answer / ansar khan
plaster on rcc 1:4 and plastar on brick work 1:6
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rohit singh
For external plaster 1:4 have perfect
1-cement
4-sand
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the difference between stress and pressure??
how much cement consumption in 1 sqmt of wall cleading work (dedo)?
What is the difference between 53 grade and 43 grade cement
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
what is stub column ?
Permissible wastage of cement as per IS code ? In which IS code I get it?
explain about earth quake zones? Chennai falls under which zone
How to check the quality of fine aggregate on site?
how much steel required for 1 square meter slab?
What is the difference between simply supported beams and cantilever beams
2 Answers Osmani Constructions,
How to calculate sand,cement for 1:5ratio brick masonary
4 Answers IVRCL, Jamek, Prera Nirman Sewa, SPCL,
How to find the cuplock pipe qty in staging for Minor bridge?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)