the penetration caused by standard Condition i.e.
Standard Weight= 100 gm
Standard temp. = 25 Degree C.
Standard penetration time = 5 Seconds
Unis = 10th of mm to show the results and avoiding Errors
e.g. if the value is 30/40, the 30/40 is the bitumen
penetration value (tested in standard condition) lies
between 3 to 4 mm.

Is This Answer Correct ?    109 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

pile load testing procedure

1738


Which IS Code/American Code applied for coupler test of steel

2163


Define current ucs?

964


for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help

1545


2nd and 4rt angle elevation used in which country ?

1821






define the strength

1681


how to do sudoko puzaals?

1821


For a washout valve why are two gate valves required in normal practice?

660


Why should you show Client/Engineer activities clearly on the project plan?

1940


In block work seawalls what is the purpose of slip joints?

743


Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?

679


how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend

1588


How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?

10629


Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?

1574


How do we calculate the power of centrifugal pump?

680