why we put pocket in some structure instead of bolt.

Answers were Sorted based on User's Feedback



why we put pocket in some structure instead of bolt...

Answer / s.kuppuraj

if we use pockets in the machinery foundation we can adjust
the bolts at fixing time ,but if we directly fix bolt in
case of any mistakes u have to remove the bolt and re do the
entire process

Is This Answer Correct ?    6 Yes 2 No

why we put pocket in some structure instead of bolt...

Answer / basu

if you bolt are fixing at the costing time there is no
tollerance it is basic
to pravide the greater strength in verry minimum area to go
for higher strength (g p cement)

Is This Answer Correct ?    1 Yes 1 No

why we put pocket in some structure instead of bolt...

Answer / saeng

some bolts are need special grounting or non shrinkage
concrete aroud them .

Is This Answer Correct ?    1 Yes 1 No

why we put pocket in some structure instead of bolt...

Answer / shailesh srivastava

For accurate fixing.Because at the time of poring it is
impossible to accurate from other related members.Due to
form work and other obstacle.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

What are the composition of a landfill?

0 Answers  


why seismic analysis not done during design of slabs

3 Answers  


If in a structure, e.g, 20mm steel bar is not available and we use 16mm steel bar instead of 20mm bar, how can we calculate the no. of steel bars for 16mm diameter bar?

5 Answers  


How the reconcilation of the steel can be done?

3 Answers   IL, JMC, JMC Projects, Simplex,


Types of Water Proofing Material?

2 Answers  






natucher of concrete &type of concrete?

0 Answers  


how to take quantity in triangle section for calculating tender purpose

1 Answers  


How steel required for 823 sqm of flooring work in 150mm c/c in single jali?

1 Answers  


what is the detention period for oxidation ponds

2 Answers  


how much tempareture are required to make liquid state of pid leed

0 Answers   IVRCL,


How to check slab shuttering level.? Or check list for slab ?

0 Answers  


Rectangular room is more effective than a square room because ––

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)