What is Work Centre Categoey
Answers were Sorted based on User's Feedback
Answer / asheesh aswal
work centers (for example, production work center,
maintenance work center).
The work center category determines which data can be
maintained in the master record for the work center.
Is This Answer Correct ? | 15 Yes | 0 No |
Answer / srsaru991
Basically work center category decides the capacity (means
ability to do work). The category defines the activity type
for costing and scheduling the categories mainly we come
accross in the production are labour and machine. Hence to
define labour cost, machine cost and setup cost we define
work center category to create work center and we enter
defaults therein. For a period of time if there are no much
changes we generally prefer production line, and if there
are much changes in the production we prefer activity type
for individual order which we call production order. By
this you can understand cat type 001 for machine and cat
type for labour.
Work center category used to define which screen selection
& field selection for a particular work center.
OP40 is the T. Code for Work Center Category.
Is This Answer Correct ? | 8 Yes | 3 No |
Answer / abhishek kumar sharma
Basically Work Center is nothing but a Executer agency inside the Plant to execute some specific type of Work, Like Production, Maintenance etc. So As per their work profile we used to define the Group of people as a Work center, differentiated with their category (Production Work Center, Maintenance Work Center etc.)
Is This Answer Correct ? | 1 Yes | 0 No |
Where is a service contract is assigned to a piece of equipment?
What is maintenance planning? What are different types of maintenance planning?
What do the qs42 tcodes in sap- pm mean?
I have a single cycle maintenance plan that is triggered by a counter assigned to a equipment A. If I replace equipment A with equipment B how do I change my Maintenance plan counter? When I use IP02 "change maintenance Plan" the counter box is greyed out. Thanks for any advice.
1)can we create a maintenance plan without planning the cost in it?
2 Answers Accenture, CSC, IBM, Ronak, Sabic,
If I want to trigger a maintenance order from a maintenance plan on every 7th day of a month, then what settings will I do in the maintenance plan other than a maintenance cycle of 1 month.
Which movement type is used to post goods movement against reservation triggered from maintenance order? Is it possible to change it?
Which all modules you can integrate with sap pm?
You want to distinguish between an equipment that has been charged or not charged for service. How would you do that?
What is the task list in preventive maintenance?
Where do we use multiple counter maintenance plans? Explain with an example?
If I want to change the planning plant for the task list, how should I proceed?