Answer Posted / asheesh aswal
work centers (for example, production work center,
maintenance work center).
The work center category determines which data can be
maintained in the master record for the work center.
| Is This Answer Correct ? | 15 Yes | 0 No |
Post New Answer View All Answers
Explain the refurbishment process?
Which t code is used to do usage decision on inspection lot triggered by calibration order?
Which equipment category is used to represent laboratory equipment?
What do you understand by horizontal and hierarchical data transfer?
Which table would you use to extract the equipment hierarchy installed under functional location?
You wan to find a table which gives you user status with the notification number. What steps will you take?
How will you make a field mandatory in maintenance notification for a certain notification type?
I have scheduled a maintenance plan but I am unable to see the all due (plan) dates of maintenance order in schedule overview. Which setting will I check in maintenance plan?
Which of the following Master data is relevant for PM ? ( Bill of Material ,Customer Master , Functional Location ,Vendor Master ??)
list the standard mis reports available in pm.
Which t code is used to create refurbishment process?
What is maintenance plan? Name all types of maintenance plans.
Can we assign more than one maintenance item to a maintenance plan?
Explain the key steps performed in refurbishment process?
How equipment master is integrated with asset master in fi module?