Answer Posted / abhishek kumar sharma
Basically Work Center is nothing but a Executer agency inside the Plant to execute some specific type of Work, Like Production, Maintenance etc. So As per their work profile we used to define the Group of people as a Work center, differentiated with their category (Production Work Center, Maintenance Work Center etc.)
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is the use of cats?
What must you do if you have assets (functional locations) with the same number in several plants?
What is sap pm ?
Where do you assign activity type in master data?
Is it necessary to run the ip transaction code for each maintenance plan that we have scheduled ?
What are different components under maintenance planning?
What is item category?
What are the key responsibilities in sap plant maintenance?
What do the qs42 tcodes in sap- pm mean?
What is difference between corrective maintenance and preventive maintenance?
When we do enhancement by adding user defined fields in notification. Is it possible to select notifications based on user defined fields in l?
Is it possible to change the structure indicator of functional location?
How pm module is integrated with mm module?
How can I release the collective preventive maintenance orders?
What is purpose of construction type in equipment master?