a)If column dimensions are 250*400mm , what will be cutting length for 8mm stirrups and how to ca..

Answer / rajeev

For This cutting length will be
2x170+2x320-4x2d+9d
340+640-64+72=988

Is This Answer Correct ?    7 Yes 8 No

a)If column dimensions are 250*400mm , what will be cutting length for 8mm stirrups and how to ca..

Answer / haris

Cutting Length = (length of Column-2*cover+Breadth of
Column-2*cover+1hook)*2-5*2*d

where
1 hook = say 10d
5*2*d= bend deductions

Is This Answer Correct ?    5 Yes 6 No

a)If column dimensions are 250*400mm , what will be cutting length for 8mm stirrups and how to ca..

Answer / kamal

what is the formula for daimond stirrup length

Is This Answer Correct ?    4 Yes 5 No

a)If column dimensions are 250*400mm , what will be cutting length for 8mm stirrups and how to ca..

Answer / sumanth

At bending potion bt trail nd error method we hav to take 2d 
nd at hookd 10d soo 
320*2
170*2
16*4
10*2
The total cutting length is 1.204

Is This Answer Correct ?    3 Yes 4 No

a)If column dimensions are 250*400mm , what will be cutting length for 8mm stirrups and how to ca..

Answer / ajay kumar

For Column when the cover is 40 mm for one side
Length of stirrup = 2 ( L + B - 4 x Cover ) + 2x10xdia of bar
L = 2 ( 400 + 250 - 4 x 40 ) + 20 x 8
L = 2 ( 490 ) + 160
L = 1140 mm Same process for beam.

Is This Answer Correct ?    0 Yes 1 No

a)If column dimensions are 250*400mm , what will be cutting length for 8mm stirrups and how to ca..

Answer / thakur

1024mm for (1)'answer
bcoz Hook for stirrups is 9D for one side and for both side it is 2*9D coz dia of bar is 8mm so it's 144mm
cover for column is 40mm, the sum of total cover is 320

the sum of whole length is 400+400+250+250=1300mm
1300-320=980mm
so the answer is 980+144 = 1124mm
cutting length for single stirrups is 1124mm when 8mm dia bar is used :) the right answer.........

Is This Answer Correct ?    0 Yes 1 No

a)If column dimensions are 250*400mm , what will be cutting length for 8mm stirrups and how to ca..

Answer / abdul sheik

let the cover 40 mm.in column,then
cutting length of ring is= 2*(120+320)+2*10*d-10*d
where hooks are= 10d+10d
deduction bend=2*5*d=10d
so length is =960 mm

Is This Answer Correct ?    0 Yes 1 No

a)If column dimensions are 250*400mm , what will be cutting length for 8mm stirrups and how to ca..

Answer / er. manoj baisla

a) let the cover 40 mm.in column,then
cutting length of ring is= 2*(170+320)+24*d-10*d+5*d
where hooks are= 12d+12d
deduction bend=2*5*d=10d
add 5 times of one dia of bar
so length is =1132mm.

Is This Answer Correct ?    16 Yes 18 No

a)If column dimensions are 250*400mm , what will be cutting length for 8mm stirrups and how to ca..

Answer / prem chand

A)CUTTING LENGTH FOR 8mm Strips=2*((250-50)+(400-50))+2*
(10*8)- 5*8

=1220mm

clear cover taken as (25+25)mm all around , deduction for
increment lenght (dia x no of bent) ,here dia is 8mm and no
of bent is 5nos.

Is This Answer Correct ?    8 Yes 10 No

a)If column dimensions are 250*400mm , what will be cutting length for 8mm stirrups and how to ca..

Answer / bitoy

wrong all answer

Is This Answer Correct ?    4 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

what is the difference between red bricks& cement bricks

2 Answers  


What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?

0 Answers  


What will you do if a portion of load bearing wall collapses under your supervision?

0 Answers   Ramesh Associates,


what is the meaning of M & 20

5 Answers  


What is the meaning and full form of FTA and MTA in plumbing material

2 Answers   FTA, L&T, MTA,






How does a traffic light signal work ?

0 Answers   KCP,


what is meant by residual strain?

0 Answers  


how much steel required for 1 sq.m area?

12 Answers   L&T,


yasser arfatcompleted his degree in civil from which university

0 Answers  


WHAT IS YOUR FUTURE PLANS FOR THE COMPANY IF PERMANENTLY EMPLOYED

4 Answers   Oil and Gas Jobs,


What is the difference between Backfilling & Refilling in Earth Work Group Item ?

3 Answers  


How to calculate stirrups cutting length in columns

2 Answers   Construction,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)