will fix foundation bolts at site with out template is
there any procedure?
No Answer is Posted For this Question
Be the First to Post Answer
what is mean by k150
what is local scouring?
mix design procedure for 1:6 cement mortar
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
Explain moment of inertia?
All aptitude question of Bechtel
How to calculate the Water cement ratio of reqiured compressive Strength of concrete?
what is compressive strength of bricks?
what is civil engineer greatest strength and weakness?
Why can i adopt concreting insted of rubble solling in beds? In comoarision concreting is cheaper than the soling.
What is the l/d ratio of cantilever beam?
Hi, Please tell me the ISI specification for the duration of concrete to achieve full strength of concrete. Is it 28days?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)