a)If column dimensions are 250*400mm , what will be
cutting length for 8mm stirrups and how to calculate it? b)
If beam dimensions are 200*400mm , beam coveris 25mm , slab
cover is 20mm , what will be the cutting length for
stirrups? c)Column dimensions are 250*400mm , reinf. is
12nos. bar of 16mm dia , stirrups provided are two legged,
what will be the length of each ring?
Regards
Answer Posted / prem chand
A)CUTTING LENGTH FOR 8mm Strips=2*((250-50)+(400-50))+2*
(10*8)- 5*8
=1220mm
clear cover taken as (25+25)mm all around , deduction for
increment lenght (dia x no of bent) ,here dia is 8mm and no
of bent is 5nos.
| Is This Answer Correct ? | 8 Yes | 10 No |
Post New Answer View All Answers
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
what is BPM in concrete demolition hammers. what is better a higher value or lower
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
why building got air crack? if it get in one particular are what is means?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
In reclamation works what are the importance of geotextiles and sand?
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
What is the coeffiencent Friction Angle between Steel and Ashphalt?
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
types of survey and levelling instrument ?
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
what is flashing?