a)If column dimensions are 250*400mm , what will be
cutting length for 8mm stirrups and how to calculate it? b)
If beam dimensions are 200*400mm , beam coveris 25mm , slab
cover is 20mm , what will be the cutting length for
stirrups? c)Column dimensions are 250*400mm , reinf. is
12nos. bar of 16mm dia , stirrups provided are two legged,
what will be the length of each ring?

Regards

Answer Posted / abdul sheik

let the cover 40 mm.in column,then
cutting length of ring is= 2*(120+320)+2*10*d-10*d
where hooks are= 10d+10d
deduction bend=2*5*d=10d
so length is =960 mm

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What year was the keystone power plant in Indiana County constructed?

728


Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2040


What are moment of inertia and its importance in civil engineering?

696


Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?

1398


Form where IS456 is adopted in 1978?

1497






in plate load test what is the thickness of plate 20mm 5mm 50mm none

1714


How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?

1705


When column of building is abutting the boundary line,then suitable footing advised is

1953


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

1588


how to remove the quantity of metal 1 and metal 2 in concrete

1534


in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft

1504


How much quantity of rod binding work by a rod binder per day

859


What is rolling stock

1891


What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code

1616


1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM

2648