Answer / asif imam
When the Ast, design moment , permissible stress are less than that of maximum condition or balanced section is known to be under reinforcment condition.
Where as when the Ast, design moment, permissible stress are more than that of maximum codition or balanced section is knwon to be over reinforcement codition of a section or beam.
| Is This Answer Correct ? | 0 Yes | 1 No |
1. What type of job are you holding at the moment? Name of present / last employer?
How to calculate water tank capacity in Ltr
3 Answers Bohra Industries Limited,
How to calculate the material for pile 450 mm dia & 300 mm dia with formula find Cement = ? Sand = ? Blue metal = ?
I am constructing a house having 20' X 19' hall. Do I need to go for a concealed beam. any alternative please? Thanks if a design is provided.
Cement coefficient used for Solid and hollow concrete blocks
how do you stabilize a waterlogged area in road construction
How many bricks,sand,cement in 1m3 bricks masonary
Why size of brick used at site is different from its standard size ?
how to calculate the density for high density concrete ? or is it same as the density of RC?
how many bags 0f opc cement in 1 m³
what will happen if one could not properly follow the spacing of slab reinforcement bar?
0 Answers Yirgalem Construction,
can anybody provide me the HPCL apptitude papers?am having the test on march 2008 so plz
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)