How many steel is require in one sqft area?
Answers were Sorted based on User's Feedback
Answer / n c pathan
It depends upon the height of the building. If the
structure is G + 3 the steel consumption is about 2.5 kg
per sq.ft. If the structure is tower of 15 storeys the
steel consumption can be as high as 6 kg per sq.ft. For
towers which are 25 storeys high steel consumption is 7.5
kg per sq.ft.
| Is This Answer Correct ? | 174 Yes | 24 No |
Answer / sk.mahaboob basha
It varies based in structure
for G+1 floor - 1.6kg
for G+5 floors - 2.25kg
for G+12 floors - 3.5kg
| Is This Answer Correct ? | 120 Yes | 54 No |
Answer / kamlesh
The steel is required as per the type of structure, that means the tentative calculation of steel is as per below,
For Foundation & Slab = 80Kg/Cu.M.
For Column = 100 Kg/Cu.M.
For Beam = 120 Kg/Cu.M.
The Cu.M. quantity is RCC quantity of structure.
| Is This Answer Correct ? | 40 Yes | 13 No |
Answer / nitin
As a Thumb rule : Residential :-1)for G+7 structure - 3.00 to 3.50Kg/sft
2) For tower more than 7flrs. to 20 flrs. - 5.00 to 6.00 Kg/Sft
3) For tower more than 20flrs. to 50 flrs - 7.00 to 8.00 Kg/sft
Commercial - Ranging from 6.00 to 8.00 Kg/sft
| Is This Answer Correct ? | 19 Yes | 4 No |
Answer / rooban
Residential building - 4.5 to 4.8 kg/sft
Commercial building - 5.0 - 5.3 kg/sft
| Is This Answer Correct ? | 26 Yes | 18 No |
Answer / prashant kadam
A)Residential building
Upto 5 th floor. :-. 2.75 Kg/sft
Upto 12th floor. :-. 3.50 Kg/sft
Upto 20th floor. :-. 4.75 to 5.0 Kg/sft
B) commercial Building :- 4.8 to 5.25 Kg/sft
| Is This Answer Correct ? | 8 Yes | 2 No |
Answer / md.nazimul islam bhuiyan
It varies from 1Kg to 1.5kg per sft.
| Is This Answer Correct ? | 59 Yes | 54 No |
Answer / kadir
for framed structure upto 3 story depends on span steel qty may vary
| Is This Answer Correct ? | 4 Yes | 1 No |
how much time will take for G+22 building for completion? activity wise like excavation,sub structure,superstructure,finishing,handover?
How many No of 4" Bricks Get consumed in 9" thick BB Masonary Wall of 1 cu.m.?
why we create short columns under grade slab?
std ht of wallmixer from ffl
What is Well Point System in Dewatering
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
WHY SHOULD WE HIREYOU OVER THE OTHERS WAITING TO THE INTERVIEW?
koi bta sakta ha ka steel ko calculate krna ka full mathod pls
VAT and CST ? Which benefits for buyer ? Why benefits?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
practically where this hinge and roller condition used
i have open space in my house, i want to make pcc there, si want to know how i calculate material , my area measurement is 10' x 10' x .25', pls tell me how much need cement, sand, concrete,if possible u than pls tell me the formula
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)