MEIL Interview Questions
Questions Answers Views Company eMail

What is the rating of your capacitor bank at your company.

30 42846

I want formula to calculate cable size as per load given in kw & amp.I searched many sites but didn't right answer.Plz reply me asap.

40 362322

What is switching over voltage?

1 3279

What is the exact meaning for under & over reinforced beams & when they have to used..

11 49736

If any HVDC line is going with positive & negative(the negative usually have return path of current with earthing electrode). Now the question is if this HVDC earthed electrode which is using as return path and earthed any nearby 400kv or 220kv AC substation equipments. which will be the impact of this on AC substation & its equipment, how severe may be this and what should be the minimum distance require between HVDC earthed electrode and AC substation equipments? It's really an high engineering level question...Dare to answer and increase your knowledge.

635





what is meant by fuzzy logic? what is fuzzification and defuzzification?

5 18553

how to find the ballast lost from the actual wattage? for example i am going to buy decorative type 2x36watts fluorescent light fitting for this lamp how to find the ballast lost? is there any formula?

2 2195

how rated the neutral voltage of transformer and reactor, e.g. 400/220, 200MVA transformer have neutral voltage of 33kv. and reactor voltage 145kv. how this rating decided?

1 1872

How neutral voltage for transformer decided? eg 33kv neutral voltage for 200MVA transformer?

1 2299

2. What are the grades of steel used in the concrete design?

6 10578

What is the Temperature Co-officient of Resistance of PT- 1000 and PT-2000 ?

2 5674

For a 500 MVA 400/220/33KV transformer following data given HV power = 500 MVA IV power = 500 MVA LV power = 5 MVA If input power is 500 MVA then how output power is (500+5)MVA. Can anyone help

1 3626

How to calculate cement, aggregates for any one grade of concrete for icum?

1 2365

how much steel in one sq m slab?

6 6532

how can change 10mm dia @275 c/c bar spacing to 12 mm

4 2945

Post New MEIL Interview Questions




Un-Answered Questions

How much weight an electrical engine can pull??

764


What are the various classes of IP addressing? Calculate the maximum number of class A, B and C network Ids.

234


When a COBOL-DB2 program in PRODUCTION is updating main tables and gone for long run, what have to do?

2181


my jindal interview is on 24th.. can anyone give me few tips regarding the same? lik how i shud prep

681


Define capital

733






Which function to use to compare the application date with system date?

608


what is cost center & cost categories in tally

961


how do we code triggers , store procedure , Performance tuning and indexing in a Java Project? Pls kindly get me the perfect answer with the code for each....thank you in advance............pls any body kindly help me soon as possible....

748


Cello pen gross value is 935.89 for 12 nos 14.5% tax

486


To validate a range of values for a property whenever the property values changes,which type of property procedure you use?

656


What are Unary arithmetic operators?

235


how to conduct dc resistance test for rotor of an alternator and how to measure the rotor dc resistance value theoritically?

1809


What is server control

761


How can you use an Oracle sequences in Informatica ? You have an Informatica sequence generator transformation also. which one is better to use?

1073


through which phases a software ttester need to pass like as a junnior test engineer,team lead,project lead,etc.? which is the final stage of your promotion and how will u achieve?

528






MEIL Interview Questions
  • Engineering (1)
  • Civil Engineering (6)
  • Mechanical Engineering (2)
  • Electrical Engineering (9)
  • Instrumentation (1)