There are two types of site civil engineer , first job is a
supervisory one if he works with the consultant, in this
case he needs to make sure that the document in hand is the
correct designed and issued for construction , then he will
supervise the construction contractor to make sure that
work is being carried out as designed and in accordance to
standards.
The second type , is the execution part where he works with
the construction contractor, in this case he has more
responsibilities, where he has to adhere to the design
document, quality of work, the schedule, safety of the
people, costs and more over to satisfy the consultant at a
personal level
| Is This Answer Correct ? | 21 Yes | 0 No |
Answer / k sivaprakasam
reading to latest drawinng and given BOQ, PLANNING AND
CALCULATING MATERIAL REQUIREMENT AND MAINLY WELL LABOUR
MANAGEMENT. TASK IN RIGHT WORK IN FIRST TIME (IT WILL BE DO
NOT REWORK)
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / kanchan
First responsibility of CE is to carry out work as per drawing and specification
1) Finding out the quantity of material
2) Wastage of material
3) Time period of work execution
Deshuttering & curing comes under this category
4) Quality control
5) Labour management
6) Supervising the work at every step
| Is This Answer Correct ? | 2 Yes | 0 No |
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
how many rod are needed in 99sqft room .
5 Answers Associated Construction Company,
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
What is the difference between "working stress method" And "limit state method"?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
1 Answers AIZAZ General Contracting General Maintenance, GK Realtors,
how can we calculate the amount of concrete in trapezoidal footing?
How gate result to cube for 7 day? Formula for the cube testing?
1 Answers Ambuja, Indiabulls, Legacy,
what is the cut length for Fe 500?
What is the cement and sand consuption of 1:4 block work
what are the proper pipes for salt water line
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)