1.what is the main responsibilites of Site Engineer ? and
what are main attitude ?
Answers were Sorted based on User's Feedback
There are two types of site civil engineer , first job is a
supervisory one if he works with the consultant, in this
case he needs to make sure that the document in hand is the
correct designed and issued for construction , then he will
supervise the construction contractor to make sure that
work is being carried out as designed and in accordance to
standards.
The second type , is the execution part where he works with
the construction contractor, in this case he has more
responsibilities, where he has to adhere to the design
document, quality of work, the schedule, safety of the
people, costs and more over to satisfy the consultant at a
personal level
| Is This Answer Correct ? | 21 Yes | 0 No |
Answer / k sivaprakasam
reading to latest drawinng and given BOQ, PLANNING AND
CALCULATING MATERIAL REQUIREMENT AND MAINLY WELL LABOUR
MANAGEMENT. TASK IN RIGHT WORK IN FIRST TIME (IT WILL BE DO
NOT REWORK)
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / kanchan
First responsibility of CE is to carry out work as per drawing and specification
1) Finding out the quantity of material
2) Wastage of material
3) Time period of work execution
Deshuttering & curing comes under this category
4) Quality control
5) Labour management
6) Supervising the work at every step
| Is This Answer Correct ? | 2 Yes | 0 No |
HOW TO PARKING SPACE HS CALCULATED IN MULTISTORY BUILDING?
How to calculate the volume of sloped isolated footing?
how to take quantity in triangle section for calculating tender purpose
how much of the strength comes from post-production curing
we are roofing contractors,we are filling a bill in work contract 4.12% method, we collecting 4.12% from our customer but every month we have been paying the vat at 2% from our pocket on the total value of bill. our auditor told me the above method do not collect 2% from the customer side is it true?
HOW TO DETERMINE FOUNDATION DEPTH OF A MULTYSTORIED BUILDING. IS THERE ANY OTHER FORMULA EXCEPT RANKINE'S MINIMUM DEPTH FORMULA.
why is M30 grade Concrete use for Foothing & Column M50
Explain what is zoning permit?
HOw much % of premium on DSR-2013 currently
y we need to take 28 days strength as compressive strength ? y cant we take 30 th day
what is the least-count of plane- table,dumpy,theodolite,compass,tachometer?
Volume of 25kg putty bag & 40 kg putty bag volume??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)