1.what is the main responsibilites of Site Engineer ? and
what are main attitude ?
Answers were Sorted based on User's Feedback
There are two types of site civil engineer , first job is a
supervisory one if he works with the consultant, in this
case he needs to make sure that the document in hand is the
correct designed and issued for construction , then he will
supervise the construction contractor to make sure that
work is being carried out as designed and in accordance to
standards.
The second type , is the execution part where he works with
the construction contractor, in this case he has more
responsibilities, where he has to adhere to the design
document, quality of work, the schedule, safety of the
people, costs and more over to satisfy the consultant at a
personal level
| Is This Answer Correct ? | 21 Yes | 0 No |
Answer / k sivaprakasam
reading to latest drawinng and given BOQ, PLANNING AND
CALCULATING MATERIAL REQUIREMENT AND MAINLY WELL LABOUR
MANAGEMENT. TASK IN RIGHT WORK IN FIRST TIME (IT WILL BE DO
NOT REWORK)
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / kanchan
First responsibility of CE is to carry out work as per drawing and specification
1) Finding out the quantity of material
2) Wastage of material
3) Time period of work execution
Deshuttering & curing comes under this category
4) Quality control
5) Labour management
6) Supervising the work at every step
| Is This Answer Correct ? | 2 Yes | 0 No |
What us meant by DLP & liquidated damages in civil quantity surveying
what is the price of a cubic meter of concrete on international market?
What is the amount on nails per bag needed for 1m square of wooden form work?
2 Answers Ansal Housing, College School Exams Tests,
Why are the bolts that hold steel rails together in oval holes?
1. if only 1 slab of a floor get sagged, how could be it repaired? 2. if any footing gives the cube result, after 28 days less than 16 n/mm2 in spite of 20 n/mm2 what are the remedies ?
In 1:2:4 ratio how much kgs of cement,fine&coarse aggregates to be used 1cu.m
what is the difference between 2 legged to 4 legged stirrups?
the min diameter of steel used in footing are
What is the difference between load bearing and non load bearing walls? How to distinguish both?
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
16 Answers Reliance, Siddhi Constructions,
Questions related to civil.engg in company
what is the quantity of cement( in bags),sand and aggregates required for 1 cmt of M 25 concrete
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)