what is the least count of Total station
Answers were Sorted based on User's Feedback
Answer / vikas kumar
sorry for above answer. Right answer is below
1 sec
3 sec
5 sec
Is This Answer Correct ? | 35 Yes | 12 No |
Answer / shantaram salunkhe
depend of TS modal
leica TS06 Least count 1Seccond & +-1mm
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / jagadeesh
1mm because total station only measures distances and slopes but not angles
Is This Answer Correct ? | 1 Yes | 1 No |
how tl calculate lap lengh of concrete in different grade of concrete.
How we can calculate cement and sand for a wall 25ft x 28ft.Thickness of wall is 9inches.
Is the ratio fixed for M-20,M-25,M-30,M-35....grades of concrete??
2 Answers Ahluwalia Contracts, L&T,
what is the difference between site engineer & site incharge
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
which type of cement is used for RCC construction?Why?
material cost to cast m20 grade rcc
what is pmc(in rigid pavement)
As column is compression member then why we use steel to make it reinforced as it is already capable of taking compressive load?
2 Answers MBL Infrastructures,
What is code for designing a sheet pile?
what is mean by splice length? As there were any formula to calculate the splice lenght?
How many modular bricks are required for 1 cubic meter of brick masonry?
14 Answers ITI, L&T,