Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


in our sub station why we step down firstly 33kv\11kv then
11kv to 430v. can we direct step down 33v to 430.v.

Answers were Sorted based on User's Feedback



in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 3..

Answer / arun

yes. by using step down transformer (33Kv to 430V

Is This Answer Correct ?    17 Yes 3 No

in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 3..

Answer / jeff

yes you can, normally they use 33kv/11kv tranformer because
the side have more than 2 sustation and need more
transformer, for the 33/.433kv transformer is expensive
than 11/.433 transformer. so they just step down the HT
33KV to 11KV first than supply to two substation by using
11/.433kv transformer

Is This Answer Correct ?    9 Yes 0 No

in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 3..

Answer / engineering.force

One more important point you all have missed is about the
secondary winding current. If we step down from 33/11 KV the
secondary current will be less than if we step down from 33
KV/440 V, hence the secondary winding has to be accomodated
with above high value of current. This will lead to increase
in winding diameter, thus increasing the overall size of the
transformer, and also increase in the heating of the
secondary, thereby reducing the efficiency of the
transformer. And hence costly. So taking in the above
considerations, we have to design the step down voltage
level so as to make it cost effective and economical.

Is This Answer Correct ?    8 Yes 0 No

in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 3..

Answer / puneet kulshreshtha

IN PAST MANY OF TIMES WE USE 33/.430 KV S/S

BUT IT IS VERY EXPENSIVE SO WE USE 11/.430 S/S FOR EASY
COST AND TRANSPORTATION

Is This Answer Correct ?    4 Yes 1 No

in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 3..

Answer / gsamguna

we can use 33kv/ 440 transformer
who said cannot
if u want 33kvto 440 u want to install two transformer
33kv/11 and 11/440v
this s stupit answer ..
sure we can use 33kv/ .44 kv directly step down

Is This Answer Correct ?    0 Yes 1 No

in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 3..

Answer / ghanshyam singh

it will be dangerous as the transformers which converts 11
kv to 430 volts cant be installed in colonies

Is This Answer Correct ?    0 Yes 8 No

in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 3..

Answer / arup

for the industrial purpose we have to step down the voltage from 11kv to 430 v.no we can't step down 33kv to 430v

Is This Answer Correct ?    2 Yes 11 No

Post New Answer

More Electrical Engineering Interview Questions

What is the universal motor?

0 Answers  


can transformer work on dc or not?if we increase the inductance of transformer can it happen to work on dc?

1 Answers  


why the transformer connected like STAR- STAR, DELTA- DELTA, STAR- DELTA, DELTA-STAR ...? why these connections ,,, explain the advantages these connections?

0 Answers  


can we use only a isolator in the subtation..

1 Answers   ABB,


why d.c motor speed decress with increass in load?

1 Answers  


Can someone help me in the Below Quest on Earthing 1.Types of Earthing and Recommended for what use 2.What is the Pit value /Panel N -E value should be or within limit for RP and UPS .

1 Answers  


ratings of lightning arrester

0 Answers   Bajaj,


When the relative speed between the magnetic fields of stator and rotor does is zero under steady state operation?

0 Answers   HPCL,


How would u describe the function of a generator & motor?

5 Answers  


What is meant by shunt current?

1 Answers   ABC,


What is FM 200?

2 Answers   Dalkia,


what is transient stability analysis means?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)