what is the meaning of explodinG a BOM
Answers were Sorted based on User's Feedback
Answer / samir
it means tranfering requirement from BOM header material to
BOM items.
Is This Answer Correct ? | 7 Yes | 1 No |
Answer / abhijit guharoy
it is the process of multiplying the requirement by the
usage quantity and recording the appropriate requirements
throughout the product tree
Is This Answer Correct ? | 6 Yes | 1 No |
Answer / ajit kumar santi
A BOM Explosion answers the question of :- what is the product made of ? & we need BOM Explosion when we want to:-
a)Determine material Requirement for a product.
b)Look at the overall structure of a product in a design department.
c)See an overview of the parts & material required.
d)Calculate the effect of changes to cost.
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / syed
Using gross-net calculation within material requirements
planning, a BOM explosion is carried out from the finished
product to the individual component.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / rahul
entry to be made- this much of Material B is needed to produce Material A.
Is This Answer Correct ? | 2 Yes | 5 No |
In implementation stage tell some standard scenario before AS-Is & TO-BE
We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
What is advantage of repetative manufacturing ?
Explain different inspection type you used .
What is BOM Group and Group BOM
Explain PI sheet.
What are commmon tickets in SAP PP in support project,examples?
Explain what happens to planned after it has been converted into production order?
What is the transaction code to run MRP for sales order?
How to create PRT master record?
how to create report in sap pp
What is Inspection Points?