What is difference between PLC and SCADA
Answers were Sorted based on User's Feedback
Answer / sreenu
scada means Supervisory Controlling area Data Assembly
This is one type of the controlling process.
| Is This Answer Correct ? | 28 Yes | 75 No |
What are the different ratings of the fuse units for different distributions at your organization?
how we select ac fuse rating of an power inverter???
why is that a 4*4mm cable,is always powdered internally
1.How to calculate backup time from series connected battery of 12v dc with 26Ah for 2battery?
what is the voltage regulation constant of ACSR Raccoon conductor
What is the difference between online and offline UPS
What is difference between 220v/50Hz & 120V/60Hz?
What should be value of Circuit breaker operating time and tripping time?
Why the bypass and blocking diodes are used in solar modules?
better choice of area of interest to post in our resume?
How to select busbar?
Why is a synchronous motor always star connected??
0 Answers Bhushan Power Steel,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)