What is the differance between negative dc voltage and positive dc voltage because some circuit uses -24,-5,-12,- 15,volt dc supply
10 37577We wish to test 60 Hz systems from a 50 Hz supply. To acheive frequency conversion, we use a VFD. The VFD powers 40 kVA transformer, which has motor and non-motor loads on it. Will the transformer work?
2 6564Post New Suzlon Interview Questions
journal entry for goodwill and capital bought by a new partner?
What is the difference between childNode and children?
How do I create a simple web page?
what is gridrotor resistance starter
any body,pls tell me how to done relay coordination ? how to coordinate by TCC curve?how to read the tcc curve?
How to insert a new row into a table with "insert into" statements in ms sql server?
What is xaml file in c#?
How do I manually update my android os?
Which method is preferred to save datas like database?
What should I make with python?
Why the lower byte address bus(a0-a7) and data bus (d0-d7) are multiplexed?
How is a fan trap solved?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
How many windows server licenses do I need?
1.How to maintain the Bug status Report? 2.What is project based Company and product based company?