The following equipment are installed ia a plant
1. 110KW Induction motor 4 Nos
2. 30 HP motor 3 Nos
3 15 HP Motor 3 Nos
4 7.5 HP motor 4 Nos
what is total load of plant if one of each is stand by.
Answers were Sorted based on User's Feedback
Answer / k.prakashchandra
For electricty supplier, all are connected loads
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / ankit kumar
the total load of plant is 112.94 hp if one of each is stand by.
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / vinoth
For Electrical supplier all are connected loads so we shud
consider all the total loads.
1.110kw*4= 440
2.(30*0.75)=22.75*3=68.25
3.(15*0.75)=11.25*3=33.75
4.(7.5*0.75)=5.625*4=22.5
Therfore total in kw=564.5
| Is This Answer Correct ? | 1 Yes | 2 No |
Define peak overshoot.
what happens when d cexcitation given to alternator is removed while it is running or what happens when dc excitation is failed in alternator while running?
how can we generate electricity????
why needtwo winding LV and HV in transformer?
What is the range of the stator resistance of 3 phase induction motor?
What is the size of electrical cable to be used for a space heater single phase 240V ?
How to Select transformer for 100HP motor plz... With calculation
Office , overtime and television how big this stage?
what should be the resistance between two winding. Let 10 kw motor
what is practical efficiency of power transformer..?
What is mean CT Saturation? How to calculate?
How much current can carry the 1 sq inch super enamelled copper wire?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)