What is milestone confirmation ?
Answers were Sorted based on User's Feedback
Answer / karthick
Once the operation is Milestone confirmation operation and
it is getting cofirmed,then all the preceding operation up
to untill the previous milestone operation gets confirmed
automatically.
Is This Answer Correct ? | 18 Yes | 2 No |
Answer / v.ramachandran
Confirming Milestone operation automatically confirms
preceding operations and sub operations of preceding
operations also.But sub operations of operation which is
set as milestone confimation does not get automatically
confirmed.This has to be manually confirmed.
Is This Answer Correct ? | 11 Yes | 3 No |
Answer / vijay
if an operation is defined as milestone,the confirmation of milestone operation includes all previous operations.
Is This Answer Correct ? | 3 Yes | 1 No |
What is number range and where will be configure
What is MTS and MTO and the difference between them?
Explain Availability check.
If I need to maintain a PP module in SAP from the information received from another system, Can i use a table to create the data required for creating the PP
Explain transaction code KO88 or CO88.
What is REM or What is REM profile
Explain Flexible Planning procedure or How many levels of Flexible planning.
when we need to close the production order, before the manufacturing or after the manufacturing
list the important tables used in pp.
How to create prt master records?
Which are the master data relevant for PP module?
Difference b/w Co-product & by-Product