What is the lap length for tension members if you have 16 dia steel bar and a concrete fc=30.9 and steel grade60 fy=414 mpa
4 5941sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
1891As per IS 2502 2(A+B)+24d formula is given for stirrups detailing,but explination not given for how that 24d came
1 5092I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
1773Post New L&T Civil Engineering Interview Questions
What is the replace tool?
kVA rating of ordinary transformer is increased when connected as an auto transformer because A transformation ratio increased B secondary voltage increased C energy is transferred both inductively and conductively D secondary current increased
Where will Olympics 2020 take place?
How many types of data bindings are there in angularjs?
What is the difference between Role Based and Object Based Security Model in MSCRM?
What are the Parameters need to be set when connecting EP to r/3 system what are they?
What you mean by routing in asp.net mvc?
What are state and props in reactjs?
Explain hbasestorage function?
What do you mean by the logical name of the object.
Can I use distributon class/transmission class Lightning arresots for protecting the building? If not why please explain?
You are the project manager for a custom home-building construction company. You are working on the model home project for the upcoming Show Homes Tour. The model home includes Internet connections in every room and talking appliances. You are working on the cost budget for this project. Which of the following is true? A. This process assigns cost estimates to project activities including risks and contingency plans. B. The cost baseline will be used to measure variances and future project performance. C. This process assigns cost estimates for expected future period operating costs. D. The cost baseline is the expected cost for the project.
how can you relate the goals you have for yourself to the goals of sherwin williams?
How prevents html dom based cross site scripting (xss) attacks?
What entry to be passed for Duty draw back as receivable