how we can estimate the M50 concrete for foundation?
Answers were Sorted based on User's Feedback
Answer / veer singh
you asked prepared A Estimate M-50 Concrete of foundation
First So, Depend A estimate at site because your site required is M-50 concrete So, it is justified the site is very critcal.
this is a Detail of estimate
S.no. description no. no. length width hieght Qty. unit
1 E/WinExcavation (As per site required)
2 E/W in surface (As per site required)
3 P/L Concrete M-10 (As per site required)
4 P/L Concrete M-50 (As per site required)
May be or may be not
5 Steel (As per site required)
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / satya
quantity comes in cum,i.e length x width x depth.its depend up on shape of foundation.
Is This Answer Correct ? | 0 Yes | 3 No |
roll of DLC in road constructions
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
plz tell me the most used units and their conversion in civil engg?
What is the roll of face bars in beams
what is the difference between ribbed steel & tor Steel ?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
What is componsation
0 Answers Nagarjuna Construction,
How much depth of excavation have to do for Highrised builldings?if Raft foundation how much,and Pile foundation how much?
how to calculate the dome surface area
19. Are you a team player?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
0 Answers L&T, Rail Vikas Nigam Limited RVNL, RRB,