Answer / veer singh
you asked prepared A Estimate M-50 Concrete of foundation
First So, Depend A estimate at site because your site required is M-50 concrete So, it is justified the site is very critcal.
this is a Detail of estimate
S.no. description no. no. length width hieght Qty. unit
1 E/WinExcavation (As per site required)
2 E/W in surface (As per site required)
3 P/L Concrete M-10 (As per site required)
4 P/L Concrete M-50 (As per site required)
May be or may be not
5 Steel (As per site required)
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / satya
quantity comes in cum,i.e length x width x depth.its depend up on shape of foundation.
| Is This Answer Correct ? | 0 Yes | 3 No |
comparision difference between GSB and WBM subbase in road construction
What are the alternate material for steel, Sand and aggregate
nitrates more than 45 mg/l in water lead to disease called gastroenterities motteled teeth polio none
What is expansion joint
what is the minimum compressive strength of clay brick
0 Answers Ananya Construction Infrastructure, VNC,
How to find Weathering Course Material
How Mney Layers in 8mm plywood
In 1:2:4 ratio how much kgs of cement,fine&coarse aggregates to be used 1cu.m
How to make tiles floor step by step procedure?
What Are The Different Type Of Slump Test Indications?
How do you calculate the power of a centrifugal pump?
what is meant by structural design?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)