how to calculate the value of 162?
Answers were Sorted based on User's Feedback
Answer / prabhu
=(PI/4)*d*d*7850
=Pi/4x7850xdxd
=6165.376xdxd
=(1/6165.376) x 1000 x 1000 x dxd
=dxd/162
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rafeez
density of steel x area of bar you get the direct value
7850 x t/d2
| Is This Answer Correct ? | 0 Yes | 1 No |
difference between limit state method and working stress in terms of load
punj loyed and sapurjl palanjl
For m25 1:1:2 How to get the quantities of cement,sand,agg for 1cu.mt. thnks in advnce
What does civil status mean?
What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.
What is minimum tensile strength required for structural steel works ?
What is the difference between auto & dumpy level
Define Workability ?
plastering ratio 1:3
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
I heard Thump rule about beam depth is 1" per 1' length. Is this correct? If not please tell me the thump rule.Thanks.
Hi is it any equation or relationship that describe the stress-strain diagram in concrete deep beam?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)